Section Ill Service Upon Receipt Service Upon Receipt Of Materiel Refer to the table below

SERVICE UPON RECEIPT-40MM GRENADE LAUNCHER M203/M203A1

NOTE

The initial gaging procedures for Active Army, Army Reserve, and Army National Guard are required one year from receipt of the weapons.

I

ACTION

REMARKS

a.

Remove grenade launcher and components from

The grenade launcher, swivel mount, hand guard

packaging.

assembly, quadrant sight assembly, and mounting

hardware are packaged in a protective wrapping

b.

Remove protective wrappings.

and shipped as a unit, two to a carton.

If the equipment has been damaged, report the

c.

Inspect the equipment for damage incurred during

damage on SF 364, Report of Discrepancy (ROD).

shipment.

d.

Check the equipment against the packing slip to

Report all discrepancies in accordance with the

see if the shipment is complete.

instructions of DA PAM 738-750.

Air Force users submit MDR and Product Quality

Deficiency Report to WR-ALC/LZBS, Robins AFB,

GA 31098-5609.

Marine Corps users report discrepancies in

accordance with MCO P4610.19, Transportation

and Travel Record of Transportation

Discrepancies.

Navy users submit Quality Deficiency Report to:

Commander, Code 4081 Bldg 2521, NAVSURF

WARCENDIV, 300 Hwy 361, Crane, IN 47522-

5001.

e.

Check to see whether equipment has been

Check DA PAM 25-30 for current MWO's.

modified.

f. Send M203 grenade launcher and 5.56mm M16

series rifles to direct support maintenance for

initial installation.

g.

Send M203A1 grenade launcher and 5.56mm M4

series carbines to direct support maintenance for

initial installation.

ARMY TM 9-1010-221-23&P AIR FORCE TO 11W3-9-4-2 MARINE CORPS TM 07700A-23&P/2 NAVY SW 370-AE-MMI-010

0 0

Post a comment