Table of Contents

Mandatory Safety Measures 5

Getting Started 6

1. Unboxing your machine 6

2. Mounting your XL 650 7

3. Initial Set-Up 7

A. Installation of Handle 7

B. Installation of the Spent Primer Cup and Cartridge Bin 8

C. Installation of the Casefeed Post 8

D. Installation of the Casefeed Tube Bracket 8

E. Installation of the Optional Casefeeder 9

4. Toolhead Overview 11 Lubricating Brass 11 Pistol Section - Toolhead Set Up 12

A. Station One - Installation of the Sizing/Decapping Die 12

B. Station One - The Decapping assembly 12

C. Station Two - Installation of the Powder Measure Assembly 12

D. Station Two - About Powder Bars 13

E. Station Two - Adjustment of the Powder Die/Powder Funnel 14

F. Station Two - Installation of the Failsafe Rod Assembly 15

G. Station Three - Installation of the Powder Check System 16

H. Station Four - General Information on Bullet Seating 17

I. Station Four - Seating Stems 18 J. Station Four - Installation and Adjustment of the Seating Die 18 K. Station Five - Installation and Adjustment of the Crimp Die 18

Rifle Section - Toolhead Set Up 20

A. Station One - About the Case Gage 20

B. How to Use the Case Gage 20

C. Station One - Installation of the Sizing/Decapping Die 21

D. Station One - The Decapping assembly 22

E. Station Two - Installation of the Powder Measure Assembly 22

F. Station Two - About Powder Bars 23

G. Station Two - Adjustment of the Powder Die/Powder Funnel 23

H. Station Two - Installation of the Failsafe Rod Assembly 25

I. Station Three - Installation of the Powder Check System 25 J. Station Four - How to Determine the Proper Seating Depth 26 K. Station Four - Seating Stems 27 L. Station Four - Installation and Adjustment of the Seating Die 27 M. Station Five - Installation and Adjustment of the Crimp Die 28

Final Assembly 29

1. The Primer Magazine 29

2. Installation of the Primer Early Warning System 29

3. Installation of the Locator Buttons 30

Loading Components Section

1. Primer System Overview (how it works) 30

2. Powder Bar Adjustment 30

3. Powder Check System Adjustment 31

A. Installation and Adjustment of the Powder Check Rods 31

B. Powder Check System demonstration 32

4. Filling the Primer System 32 Station Orientation and Loading Funtions 34 Caliber Conversion Section 35-42 Trouble Shooting 43-45 Caliber Conversion Chart 46-48 Schematics 49-58

Was this article helpful?

0 0

Post a comment