Elevation

JOINTS BROKEN (RIGHT)

rope diameter at the splice is not objectionable. A short splice should not be used when the rope will be passed over a pu'.ley.

(1) Unlay the strands oi each rope for at least five turns.

(2) Bring the ends or the rope together so that each strand of one rope rests between two consecutive turns of the other rope.

33 20

<D Uncoiling.

PiotnuE 43.—Colling and uncoiling right-lay iop«.

34 23

Was this article helpful?

0 0

Post a comment